I-84 lanes to close Friday for pedestrian bridge installation

AM Extra

PORTLAND, Ore. (KOIN) — Starting Friday at 10 p.m., all lanes of Interstate 84 east of Interstate 5 will be shut down in both directions for the installation of a new pedestrian bridge.

The lanes will remain closed through the weekend. Hannah Schafer with the Portland Bureau of Transportation joined AM Extra to discuss the construction.

Copyright 2021 Nexstar Media Inc. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.

Twitter News Widget

Trending Stories