Morrison Bridge reopens following drawbridge malfunction

Traffic

The malfunction happened during a weekly test

PORTLAND, Ore. (KOIN) — The Morrison Bridge is back open after being closed most of the morning due to a malfunction during a drawbridge test on Sunday.

According to the Multnomah County Communications Office, the drawbridge did not fully close at the end of the test around 7:30 a.m, with one leaf remaining about a foot above the other.

This test happens every week that the bridge doesn’t have to open for a ship.

MCCO advised commuters to use other Portland bridges while the Morrison was closed throughout the morning — but other bridge closures connected to the Portland Marathon made things messy.

After the marathon, Multnomah County Bridges tweeted the bridge will “likely need to close in the afternoon for additional repairs.”

Remember to follow KOIN 6 News on Facebook, Twitter and Instagram. Download our free news and weather apps for the latest headlines and forecast information.

Copyright 2019 Nexstar Broadcasting, Inc. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.

Top Headlines

More News

Trending Stories

Don't Miss

More Don't Miss

Twitter News Widget